Overview
Hope and Clay undertook the construction of a new overflow car park at Brackley FC, designed to service the Mercedes Benz F1 headquarters. This project required innovative solutions to address the site’s unique challenges and deliver a functional, high-quality facility.
Project Scope
The scope of works included the following key elements:
Car Park Construction: Development of a semi-permanent bodpaved car park to provide a durable and functional parking solution.
Drainage and Excavation: Reduced dig excavation and installation of Surface water drainage, including an attenuation tank to manage stormwater effectively.
Structural Support: Installation of sheet-piled foundations with a capping beam to stabilize the car park against the lower-level football pitches of Brackley FC.
Pathways and Fencing: Construction of a satellite footpath connecting Mercedes Benz F1 and Brackley FC, alongside fencing for safety and delineation.
Lighting and Security: Provision of private cable design and installation for new lighting, CCTV, barriers, and associated electrical works to meet the car park’s operational requirements.
This project exemplifies our capability to deliver tailored infrastructure solutions that integrate functionality, safety, and sustainability.